Photo By/Credit
Katy Pfannenstein/USFWS
Date Shot/Created
11/12/2021Media Usage Rights/License
Public Domain
Image
Excavator has removed dirt and is working on removing the buried culvert. A laser level was used (red/black box on tripod) to make sure the footing of the bridge (rectangle concrete wall in image) was set at the correct elevation.